
House for sale 6+1 • 145 m² without real estate, Hesse
, HessePublic transport 1 minute of walking • ParkingThis spacious end-terrace house offers plenty of room for personal expression on 145 square meters of living space spread over two floors. With a total of six rooms, the house is ideally suited for comfortable family living. The high-quality interior design underlines the appealing character of the property, which also features two bathrooms. An additional guest WC adds practical everyday comfort. Moreover, the house offers a basement that provides plenty of storage space. The property will be available for occupancy from July 1, 2027, and is waiting to be filled with new life. The house is equipped with an 8.2 kWp photovoltaic system and a 14.6 kW battery storage. The heat pump by ROTEX (now Daikin) was completely renewed 2 years ago. The two associated parking spaces are located directly on the property and come with a wallbox. On the property, there is a garden shed with a floor area of 9 square meters. The house is sold together with the high-quality fitted kitchen (Nobilia). The 90 cm induction hob, the extractor hood, and the dishwasher were renewed last year.
In the popular Wörsdorf, a suburb of Idstein, this end-terrace house is located in a quiet residential area. With its well over 3,700 inhabitants, Wörsdorf is a very popular district of Idstein (approximately 26,000 inhabitants) due to its good infrastructure and transport connections. In addition to its own train station (destinations: Frankfurt, Wiesbaden, Limburg, Cologne), the motorway connection (A3) in the direction of Cologne or Frankfurt can be reached in just 5 minutes.
Everyday shopping facilities are available, as are a doctor, pharmacy, bakery, and post office. Wörsdorf also has its own primary school and two kindergartens.
The basement, ground floor, and all bathrooms are tiled, while the upper floors (OG and DG) are laid with laminate. The bathroom on the upper floor features both a shower and a bathtub, while the bathroom in the attic is equipped with a shower. Currently, fiber-optic cable is being installed in Idstein; the lines are already at the house and will be connected during the course of the year.
Property characteristics
| Age | Over 5050 years |
|---|---|
| Condition | Good |
| Listing ID | 1019702 |
| Usable area | 145 m² |
| Total floors | 3 |
| Available from | 01/07/2027 |
|---|---|
| Layout | 6+1 |
| EPC | A - Extremely economical |
| Land space | 320 m² |
| Price per unit | €4,337.93 / m2 |
What does this listing have to offer?
| Basement | |
| MHD 1 minute on foot |
| Parking | |
| Terrace |
What you will find nearby
Still looking for the right one?
Set up a watchdog. You will receive a summary of your customized offers 1 time a day by email. With the Premium profile, you have 5 watchdogs at your fingertips and when something comes up, they notify you immediately.





















