It looks like our server is undergoing maintenance or you are offline. Some features of the site may be temporarily unavailable.
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia
house for sale, 120 m², Otawistr. 12, Duisburg, North Rhine-Westphalia

House for sale 5+1 • 120 m² without real estateOtawistr. 12 Duisburg Buchholz Nordrhein-Westfalen 47249

Otawistr. 12 Duisburg Buchholz Nordrhein-Westfalen 47249Public transport 4 minutes of walking • Parking • Garage
Price€492,000

Learn More


Translated with the help of AI

This semi-detached house, originally built in 1938, was extended with an annex in 1999 and offers approximately 130 m² of living space spread over the ground floor, first floor, and attic.

The floors are fitted with tiles and laminate.

The heating system (Vaillant VC 266 gas boiler) was renewed in 2020.

It is located in a central and sought-after area in Duisburg-Buchholz. From here, shopping opportunities, a health center, kindergartens, primary and secondary schools, as well as senior facilities, are all within easy walking distance.

Public transportation is also conveniently accessible:

The U-Bahn line U79 (Sittardsberg stop) and several bus lines are about a 3-minute walk away (approximately 30 minutes to Düsseldorf, about 17 minutes to Duisburg city center).

The S-Bahn stations Buchholz and Großenbaum are about a 20-minute walk away (providing a direct connection to Düsseldorf Airport (DUS) as well as to the entire Ruhr area).

Extension of the house in 1999

Floor coverings: tiles and laminate

Heating system: Gas boiler from Vaillant, renewed in 2020

Total living space: approximately 130 m² (including the annex)

The transport connections are excellent:

You can quickly reach the A59, A524, A52, A44, as well as the B8.

Property characteristics

AgeOver 5050 years
ConditionBefore reconstruction
Listing ID984540
Usable area120
Total floors2
Available from31/01/2026
Layout5+1
EPCG - Extremely uneconomical
Land space543
Price per unit€4,100 / m2

What does this listing have to offer?

Basement
Parking
Terrace
Garage
MHD 4 minutes on foot

What you will find nearby

Public transportSittardsberg
🚶 352 m (4 mins)
Post officeBaranowski Bürosysteme
🚘 1,340 m (3 mins)
ShopBäckerei Bolten
🚶 290 m (3 mins)
BankVolksbank Rhein-Ruhr
🚶 307 m (4 mins)
RestaurantHotel Sittardsberg
🚶 332 m (4 mins)
PharmacyElefanten Apotheke
🚶 271 m (3 mins)
SchoolSchulverbund GGS Lauenburger Allee (Teilstandort)
🚶 495 m (6 mins)
KindergardenKita Zaubersterne Buchholz
🚶 759 m (9 mins)
Sports fieldHalle 1, Reinhard-und-Max-Mannesmann-Gymnasium
🚘 1,367 m (4 mins)
Playground
🚶 739 m (9 mins)

How far to…:

Still looking for the right one?

Set up a watchdog. You will receive a summary of your customized offers 1 time a day by email. With the Premium profile, you have 5 watchdogs at your fingertips and when something comes up, they notify you immediately.