
Flat to rent 2 bedroom • 56 m² without real estateLutherstraße 24 Leipzig Neustadt-Neuschönefeld Sachsen 04315
Lutherstraße 24 Leipzig Neustadt-Neuschönefeld Sachsen 04315Public transport 2 minutes of walking • LiftThis stylish 2-room apartment with approximately 56 m² of living space is located in a lovingly renovated historic building at Lutherstraße 24 in Leipzig. The listed Gründerzeit building combines historic charm with modern living comfort and high-quality fittings.
The apartment impresses with a well-thought-out layout featuring an open-plan kitchen and living area, including a fitted kitchen that serves as a modern and convivial center of daily life.
High-quality parquet flooring in all living areas creates a pleasant ambiance. This is complemented by elegantly restored period doors and modern recessed ceiling spotlights, which together establish a coherent and contemporary lighting concept.
The modern bathroom is designed with both a bathtub and a separate shower, offering exceptional everyday comfort. Large windows ensure bright, welcoming rooms and highlight the apartment's distinctive old-building character.
The apartment is situated on Lutherstraße, directly adjacent to the popular Graphic Quarter and just minutes away from Leipzig’s city center.
The neighborhood is characterized by a vibrant mix of renovated historic buildings, creative commercial spaces, cafes, and small restaurants. In close proximity, a dynamic scene of modern bars, studios, and unique dining options is emerging, giving the area an urban, dynamic character.
Connectivity is excellent: trams and buses provide quick access to the main train station, downtown, as well as to the Graphic Quarter and South Suburb.
Additionally, the city center is reachable by bicycle within minutes. Nearby green areas, such as Elsapark and Lene-Voigt-Park, offer opportunities for sports, relaxation, and outdoor leisure.
Overall, the location combines urban energy, short distances, and a burgeoning creative environment – ideal for anyone looking to experience Leipzig in an active, city-centered way.
Property characteristics
| Available from | 07/07/2026 |
|---|---|
| Layout | 2 bedroom |
| Usable area | 56 m² |
| Condition | After reconstruction |
|---|---|
| Listing ID | 1042587 |
| Price per unit | €13.20 / m2 |
What does this listing have to offer?
| Basement | |
| MHD 2 minutes on foot |
| Lift |
What you will find nearby
Still looking for the right one?
Set up a watchdog. You will receive a summary of your customized offers 1 time a day by email. With the Premium profile, you have 5 watchdogs at your fingertips and when something comes up, they notify you immediately.











